Skip to product information
1 of 1

Our CFA has been designed with optimal pitch to allow the spoil to convey efficiently along the sections. The starter sections have been designed with cutting geometry to suit various ground conditions. Concrete can be pumped through the hollow stem while withdrawing the tool. Available with 100mm or 127mm passage with various coupling connections to suit the drilling rigs.

NU-DFRS-AUG-300-40-1

Double Flight Rock Starter Auger

Double Flight Rock Starter Auger

POA
Starter Ø (mm)
Flight Thickness (mm)
Length (m)
Quantity
View full details
Technical Dimensions
Starter Ø (mm)CFA Ø (mm)Flight Thickness (mm)Length (m)
30028040 / 30 / 201, 2, 3, 4, 5, 6
45043040 / 30 / 201, 2, 3, 4, 5, 6
60058040 / 30 / 201, 2, 3, 4, 5, 6
75073040 / 30 / 201, 2, 3, 4, 5, 6
90088040 / 30 / 201, 2, 3, 4, 5, 6
1050103040 / 30 / 201, 2, 3, 4, 5, 6